





|
Client : Clough Engineering
The Mubi River Bridge is an 80m single span steel truss bridge. The bridge superstructure collapsed during the erection due to a failure of a member in the launching nose. The owner Chevron Niugini called tenders for the recovery and Madsen Giersing prepared the detailed design of the recovery process and the temporary works required. Madsen Giersing also provided site supervision for the critical lifts. |
Click to view |
![]() |